Document Type : Research Paper

Authors

Department of Industrial and amp, Production Engineering, Jessore University of Science and amp, Technology, Jessore- 7408, Bangladesh

Abstract

The readymade garments industry is rapidly growing and now it is the single highest export earner for Bangladesh. This business sector becomes an attractive investment destination to the country’s new young entrepreneurs upcoming due to its cheaper labor cost, lower investment cost, availability of resources, governments support, etc. than the other sectors. However, many other factors are often needed to consider in investing in this garments sectors. Again, in garments sectors, there is a wide range of apparel items like shirts, trousers, jackets, sweaters, etc. options that are available to invest. Different types of apparel items demand different types of resource requirements, diverse level of capital investment, operator’s skills, and it is also related to the many other factors. Again, all the investors are not in same stand points according to their business handling capabilities, capitals in hand, business locations and so many other aspects. This paper proposes a methodology for selection best apparel item among different alternatives that will provide a decision support to the investors in opening a new garment factory. The proposed methodology is based on Analytical Hierarchy Process (AHP) under fuzzy environment. The approaches allow the decision maker to use expert’s judgment in the form of linguistic expression in the evaluation process. In the application of proposed methodology, the best apparel item is selected for opening a garment factory in Bangladesh at present conditions.

Keywords

Main Subjects

[1]      Hadad, Y., & Hanani, M. Z. (2011). Combining the AHP and DEA methodologies for selecting the best alternative. International journal of logistics systems and management9(3), 251-267.
[2]      Oguztimur, S. (2011). Why Fuzzy Analytic Hierarchy Process Approach For Transport Problems? In Proceedings of 51st Congress of European Regional Science Association - ERSA, 1-10. Barcelona, ​​SPAIN.
[3]      Saaty, T. L. (1977). A scaling method for priorities in hierarchical structures. Journal of mathematical psychology15(3), 234-281.
[4]      Saaty, T. L. (1994). Highlights and critical points in the theory and application of the analytic hierarchy process. European journal of operational research74(3), 426-447.
[5]      Chang, C. W., Horng, D. J., & Lin, H. L. (2011). A measurement model for experts knowledge-based systems algorithm using fuzzy analytic network process. Expert systems with applications38(10), 12009-12017.
[6]      Chan, F. T., & Kumar, N. (2007). Global supplier development considering risk factors using fuzzy extended AHP-based approach. Omega35(4), 417-431.
[7]      Kilincci, O., & Onal, S. A. (2011). Fuzzy AHP approach for supplier selection in a washing machine company. Expert systems with Applications38(8), 9656-9664.
[8]      Hefny, H. A., Elsayed, H. M., & Aly, H. F. (2013). Fuzzy multi-criteria decision making model for different scenarios of electrical power generation in Egypt. Egyptian informatics journal14(2), 125-133.
[9]      Petkovic, J., Sevarac, Z., Jaksic, M. L., & Marinkovic, S. (2012). Application of fuzzy AHP method for choosing a technology within service company. Technics technologies education management-ttem7(1), 332-341.
[10]  Saaty, T. L. (1980). Analytic Heirarchy Process. Wiley StatsRef: Statistics Reference Online.
[11]  Sun, C. C. (2010). A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods. Expert systems with applications37(12), 7745-7754.
[12]  Yaghoobi, T. (2018). Prioritizing key success factors of software projects using fuzzy AHP. Journal of software: Evolution and process30(1).
[13]  Kahraman, C., Cebeci, U., & Ruan, D. (2004). Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey. International journal of production economics87(2), 171-184.
[14]  Prascevic, N., & Prascevic, Z. (2017). Application of fuzzy AHP for ranking and selection of alternatives in construction project management. Journal of civil engineering and management23(8), 1123-1135.
[15]  Chang, D. Y. (1996). Applications of the extent analysis method on fuzzy AHP. European journal of operational research95(3), 649-655.
[16]  Wang, Y. M., & Chin, K. S. (2011). Fuzzy analytic hierarchy process: A logarithmic fuzzy preference programming methodology. International journal of approximate reasoning52(4), 541-553.
[17]  Kusumawardani, R. P., & Agintiara, M. (2015). Application of fuzzy AHP-TOPSIS method for decision making in human resource manager selection process. Procedia computer science72, 638-646.
[18]  Torfi, F., Farahani, R. Z., & Rezapour, S. (2010). Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives. Applied soft computing10(2), 520-528.
[19]  Esmaili Dooki, A., Bolhasani, P., & Fallah, M. (2017). An Integrated Fuzzy AHP and Fuzzy TOPSIS Approach for Ranking and Selecting the Chief Inspectors Of Bank: A Case Study. Journal of applied research on industrial engineering4(1), 8-23.
[20]  Mahendran, P., Moorthy, M. B. K., & Saravanan, S. (2014). A fuzzy AHP approach for selection of measuring instrument for engineering college selection. Applied mathematical sciences8(44), 2149-2161.
[21]  Zadeh, L. A. (1996). Fuzzy sets. In Fuzzy sets, fuzzy logic, and fuzzy systems (pp. 394-432). doi.org/10.1142/9789814261302_0021 
[22]  Bellman, R. E., & Zadeh, L. A. (1970). Decision-making in a fuzzy environment. Management science17(4), B-141.
[23]  Bouyssou, D. (2000). Evaluation and decision models: a critical perspective (Vol. 32). Springer Science & Business Media.
[24]  Chang, D. Y. (1992). Extent analysis and synthetic decision. Optimization techniques and applications1(1), 352-355.
[25]  Cheng, C. H. (1997). Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. European journal of operational research96(2), 343-350.
[26]  Cheng, C. H., Yang, K. L., & Hwang, C. L. (1999). Evaluating attack helicopters by AHP based on linguistic variable weight. European journal of operational research116(2), 423-435.
[27]  Ruoning, X., & Xiaoyan, Z. (1992). Extensions of the analytic hierarchy process in fuzzy environment. Fuzzy sets and Systems52(3), 251-257.
[28]  Arikan, F. (2015). An interactive solution approach for multiple objective supplier selection problem with fuzzy parameters. Journal of intelligent manufacturing26(5), 989-998.
[29]  Güngör, Z., Serhadlıoğlu, G., & Kesen, S. E. (2009). A fuzzy AHP approach to personnel selection problem. Applied soft computing9(2), 641-646.
[30]  Chamodrakas, I., Batis, D., & Martakos, D. (2010). Supplier selection in electronic marketplaces using satisficing and fuzzy AHP. Expert systems with applications37(1), 490-498.
[31]  Ayhan, M. B. (2013). A fuzzy AHP approach for supplier selection problem: A case study in a Gear motor company. International journal of managing value and supply chains (IJMVSC), 4(3).
[32]  Kılıç, H. S., & Çevikcan, E. (2011). Job selection based on fuzzy AHP: an investigation including the students of Istanbul Technical University Management Faculty. International journal of business and management studies3(1), 173-182.
[33]  Saad, S. M., Kunhu, N., & Mohamed, A. M. (2016). A fuzzy-AHP multi-criteria decision-making model for procurement process. International journal of logistics systems and management23(1), 1-24.
[34]  Enea, M., & Piazza, T. (2004). Project selection by constrained fuzzy AHP. Fuzzy optimization and decision making3(1), 39-62.
[35]  Shaygan, A., & Testik, Ö. M. (2017). A fuzzy AHP-based methodology for project prioritization and selection. Soft computing, 1-11.
[36]  Yucenur G. N. (2017). A producer selection problem: A case study from Turkish food industry. Beykent university journal of science and engineering, 10(2),185–212,doi: 10.20854/bujse.316308
[37]  Bozbura, F. T., & Beskese, A. (2007). Prioritization of organizational capital measurement indicators using fuzzy AHP. International journal of approximate reasoning44(2), 124-147.
[38]  Mendoza, A., & Ventura, J. A. (2008). An effective method to supplier selection and order quantity allocation. International journal of business and systems research2(1), 1-15.
[39]  Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International journal of services sciences1(1), 83-98.
[40]  Kahraman, C., Cebeci, U., & Ulukan, Z. (2003). Multi-criteria supplier selection using fuzzy AHP. Logistics information management16(6), 382-394.
[41]  Lee, S. (2014). Determination of priority weights under multiattribute decision-making situations: AHP versus fuzzy AHP. Journal of construction engineering and management141(2), 05014015.
[42]  Chang, D. Y. (1996). Applications of the extent analysis method on fuzzy AHP. European journal of operational research95(3), 649-655.
[43]  Kwong, C. K., & Bai, H. (2003). Determining the importance weights for the customer requirements in QFD using a fuzzy AHP with an extent analysis approach. Iie transactions35(7), 619-626.
[44]  Gumus, A. T. (2009). Evaluation of hazardous waste transportation firms by using a two step fuzzy-AHP and TOPSIS methodology. Expert systems with applications36(2), 4067-4074.
[45]  Hadad, Y., & Hanani, M. Z. (2011). Combining the AHP and DEA methodologies for selecting the best alternative. International journal of logistics systems and management9(3), 251-267.