[1] Masud, A. K. M., Al-Khaled, A., Jannat, S., Khan, A. S. A., & Islam, K. J. (2007). Total productive maintenance in RMG sector a case: burlingtons limited, Bangladesh. Journal of mechanical engineering, 37, 62-65.
[2] Aspinwall, E., & Elgharib, M. (2013). TPM implementation in large and medium size organisations. Journal of manufacturing technology management, 24(5), 688-710.
[3] Yadav, S., Singh, R. K., & Kumar, P. (2017). Justification of maintenance management: AHP approach. 2017 IEEE international conference on industrial engineering and engineering management (IEEM) (pp. 959-963). IEEE.
[4] Cho, S. W., Gällstedt, M., Johansson, E., & Hedenqvist, M. S. (2011). Injection-molded nanocomposites and materials based on wheat gluten. International journal of biological macromolecules, 48(1), 146-152.
[5] Rao, K. R., & Ravishankar, V. (2016). Parametric design for quality improvement of injection-moulded product in a consumer electronics conglomerate. International journal of experimental design and process optimisation, 5(1-2), 41-52.
[7] Rahman, C. M., Hoque, M. A., & Uddin, S. M. (2014). Assessment of total productive maintenance implementation through downtime and mean downtime analysis (case study: a semi-automated manufacturing company of Bangladesh). Assessment, 4(09).
[8] Graisa, M., & Al-Habaibeh, A. (2011). An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy. Journal of manufacturing technology management, 22(4), 541-558.
[9] Chandna, P., & Chandra, A. (2009). Quality tools to reduce crankshaft forging defects: an industrial case study. Journal of industrial and systems engineering, 3(1), 27-37.
[10] Ng, K. C., Goh, G. G. G., & Eze, U. C. (2011, December). Critical success factors of total productive maintenance implementation: a review. 2011 IEEE international conference on industrial engineering and engineering management (pp. 269-273). IEEE.
[11] Paropate, R. V., & Sambhe, R. (2013). The implementation and evaluation of total productive maintenance–a case study of mid-sized Indian enterprise. International journal of application or innovation in engineering & management (IJAIEM), 2(10).
[12] Ahmed, M., & Ahmad, N. (2011). An application of Pareto analysis and cause-and-effect diagram (CED) for minimizing rejection of raw materials in lamp production process. Management science and engineering, 5(3), 87.
[13] Ohunakin, O. S., & Leramo, R. O. (2012). Total productive maintenance implementation in a beverage industry: a case study. Journal of engineering and applied science, 7(2), 128-133.
[14] Kiran, M., Mathew, C., & Kuriakose, J. (2013). Root cause analysis for reducing breakdowns in a manufacturing industry. International journal of emerging technology and advanced engineering, 3(1).
[15] Nahar, K., Islam, M. M., Rahman, M. M., & Hossain, M. M. (2012). Evaluation of OEE for implementing total productive maintenance (TPM) in sewing machine of a knit factory. Proceedings of the global engineering, science and technology conference (pp. 28-29).
[16] Ireland, F., & Dale, B. G. (2001). A study of total productive maintenance implementation. Journal of quality in maintenance engineering, 7(3), 183-192.