Document Type : Research Paper

Author

Department of Business Management, Tonekabon Branch, Islamic Azad University, Tonekabon, Iran.

Abstract

The expansion of production and development in the industrial sector, it is necessary to increase the investment in that. But limits of the financial resources to the investment and high risk for investments in industrial and production activities on the one hand, and the frequency of necessities and goals of the other hand, is inevitable to planning and priorities of investment. This study to follow, in condition of risk and uncertainty and the exist fluctuations in supply and demand market of industry, optimization of model to determine priorities and economic feasibility to the investment in this sector. This study, in three approach (TOPSIS, VIKOR and COPRAS), will examine its purpose. This research has been made for Gilan Province from 2012 to 2015. The results of this research involve the investment criteria and specify the priority of these sectors. The final results of this study indicate based on TOPSIS, VIKOR and COPRAS, the current pattern of investment in the industrial sector was not optimal and needs to be adjusted in the percentages and amounts of investment.

Keywords

Main Subjects

[1]      Akbari, N. A., & Moradi, Z. (2008). Economic analysis and the determination of industrial investment priorities in the province of kurdistan. Journal of the faculty of humanities and social sciences, 8(3), 33-58.
[2]      Alinezhad, A. & Amini, A. (2011). Sensitivity analysis of TOPSIS technique: the results of change in the weight of one attribute on the final ranking of alternatives. Journal of optimization in industrial engineering 7, 23-28.
[3]      Danaei, A., & Haghighi, M. (2013). Measuring the relative performance of stock market using TOPSIS. Management science letters3(1), 91-96.
[4]      Duckstein, L., & Opricovic, S. (1980). Multiobjective optimization in river basin development. Water resources research16(1), 14-20.
[5]      Eydi, A., Farughi, H., & Abdi, F. (2016). A hybrid method based on fuzzy AHP and VIKOR for the discrete time-cost-quality trade-off problem. Journal of optimization in industrial engineering19(2), 105-116.
[6]      Ginevicius, R., & Podvezko, V. (2007). Some problems of evaluating multicriteria decision methods. International journal of management and decision making8(5-6), 527-539.
[7]      Lotfi, A., & Mansourabad, M. A. (2014). Priorities of industrial development of West Azerbaijan techniques using Fuzzy Topsis. J. Appl. Environ. Biol. Sci4(6), 89-94.
[8]      Opricovic, S. (1998). Multicriteria optimization of civil engineering systems. Faculty of civil engineering, belgrade2(1), 5-21.
[9]      Opricovic, S., & Tzeng, G. H. (2007). Extended VIKOR method in comparison with outranking methods. European journal of operational research178(2), 514-529.
[10]   Ustinovichius, L., Shevchenko, G., Kochin, D., & Simonaviciene, R. (2007, September). Classification of the investment risk in construction. International conference on cooperative design, visualization and engineering (pp. 209-216). Berlin, Heidelberg: Springer.
[11]   Yu, P. L. (1973). A class of solutions for group decision problems. Management science19(8), 936-946.
[12]   Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2008). Contractor selection of construction in a competitive environment. Journal of business economics and management9(3), 181-187.