Case studies in industry and services
1. Application of line balancing heuristics for achieving an effective layout: a case study.

T. Ahmed; N. Sakib; R. M. Hridoy; A. T. Shams

Volume 9, Issue 2 , Spring 2020, , Pages 114-129

http://dx.doi.org/10.22105/riej.2020.234612.1134

Abstract
  This project is a case study conducted in a manufacturing company aiming at improving its productivity using line balancing techniques. Waste reduction, especially the time waste, is an important factor to shrink the manufacturing cost. The main purpose of this project is to suggest a better line balancing ...  Read More

Total quality management and quality engineering
2. Development of a maintenance schedule plan to improve the equipment efficiency of an industry: a case study

A. T. Shams; Md. F. Rabby; Md. N. Istiak

Volume 8, Issue 2 , Spring 2019, , Pages 140-157

http://dx.doi.org/10.22105/riej.2019.174907.1082

Abstract
  The aim of this study is to implement Total Productive Maintenance (TPM) in a continuous injection molding industry. By implementing TPM, the industry can increase their Overall Equipment Effectiveness (OEE) and productivity. Before implementing TPM, overall equipment efficiency, availability rate, performance ...  Read More

Total quality management and quality engineering
3. Total quality management (TQM): Implementation in primary education system of Bangladesh

K. Hasan; Md. S. Islam; A. T. Shams; H. Gupta

Volume 7, Issue 3 , Autumn 2018, , Pages 370-380

http://dx.doi.org/10.22105/riej.2018.128170.1041

Abstract
  The role of primary education is to ensure the broad-based development of pupils. This means ensuring that all pupils are able to develop their cognitive, social, emotional, cultural, and physical skills to the best of their abilities and preparing them for their further school career. It is known that ...  Read More