[1] Brucker, P., Drexl, A., Möhring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European journal of operational research, 112(1), 3-41.
[2] Kolisch, R., & Hartmann, S. (2006). Experimental investigation of heuristics for resource-constrained project scheduling: An update. European journal of operational research, 174(1), 23-37.
[3] Hartmann, S., & Kolisch, R. (2000). Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European journal of operational research, 127(2), 394-407.
[4] Petrović, R. (1968). Optimization of resource allocation in project planning. Operations research, 16(3), 559-568.
[5] Demeulemeester, E. L., & Herroelen, W. S. (1997). New benchmark results for the resource-constrained project scheduling problem. Management science, 43(11), 1485-1492.
[6] Brucker, P., Knust, S., Schoo, A., & Thiele, O. (1998). A branch and bound algorithm for the resource-constrained project scheduling problem1. European journal of operational research, 107(2), 272-288.
[7] Mingozzi, A., Maniezzo, V., Ricciardelli, S., & Bianco, L. (1998). An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation. Management science, 44(5), 714–729.
[8] Klein, R., & Scholl, A. (1999). Progress: Optimally solving the generalized resource constrained project scheduling problem. Mathematical methods of operations research, 52(3), 467–488.
[9] Blazewicz, J., Lenstra, J. K., & Kan, A. R. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete applied mathematics, 5(1), 11-24.
[10] Kolisch, R., & Hartmann, S. (1999). Heuristic algorithms for solving the resource constrained project scheduling problem: Classification and computational analysis. In J. Weglarz (Ed.), Project scheduling, recent models, algorithms and applications (pp. 147– 178). Boston: Kluwer Academic.
[11] Ballestín, F., Barrios, A., & Valls, V. (2011). An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags. Journal of scheduling, 14(4), 391-406.
[12] Kima, K. W., Gen, M., Yamazaki, G. (2003). Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Applied soft computing, 2(3), 174–188.
[13] Cervantes, M., Lova, A., Tormos, P., Barber, F. (2008). A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem. Lecture Notes in Computer Science. Berlin, Heidelberg: Springer.
[14] Goncalves, J. F., Mendes, J. J. M., Resende, M. G. C. (2008). A genetic algorithm for the resource constrained multi-project scheduling problem. European journal of operational research,189(3), 1171–1190.
[15] Mendes, J. J. D. M., Gonçalves, J. F., & Resende, M. G. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & operations research, 36(1), 92-109.
[16] Valls, V., Ballestin, F., & Quintanilla, S. (2008). A hybrid genetic algorithm for the resource-constrained project scheduling problem. European journal of operational research, 185(2), 495-508.
[17] Zamani, R. (2013). A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem. European journal of operational research, 229(2), 552-559.
[18] Bouleimen, K. L. E. I. N., & Lecocq, H. O. U. S. N. I. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European journal of operational research, 149(2), 268-281.
[20] Valls, V., Quintanilla, S., & Ballestı́n, F. (2003). Resource-constrained project scheduling: A critical activity reordering heuristic. European journal of operational research, 149(2), 282-301.
[21] Glover, F. (1989). Tabu search—part I. ORSA journal on computing, 1(3), 190-206.
[22] Thomas, P. R., & Salhi, S. (1998). A tabu search approach for the resource constrained project scheduling problem. Journal of heuristics, 4(2), 123-139.
[23] Merkle, D., Middendorf, M., & Schmeck, H. (2002). Ant colony optimization for resource-constrained project scheduling. IEEE transactions on evolutionary computation, 6(4), 333-346.
[24] Luo, S., Wang, C., & Wang, J. (2003, November). Ant colony optimization for resource-constrained project scheduling with generalized precedence relations. , 2003. Proceedings of 15th IEEE international conference on tools with artificial intelligence (pp. 284-289). IEEE.
[25] Zhang, H., Li, X., Li, H., & Huang, F. (2005). Particle swarm optimization-based schemes for resource-constrained project scheduling. Automation in construction, 14(3), 393-404.
[26] Zhang, H., Li, H., & Tam, C. M. (2006). Particle swarm optimization for resource-constrained project scheduling. International journal of project management, 24(1), 83-92.
[28] Amiri, M., & Barbin, J. P. (2015). New approach for solving software project scheduling problem using differential evolution algorithm. International journal in foundations of computer science & technology (IJFCST), 5(1).
[29] Storn, R., & Price, K. (1997). Differential evolution–a simple and efficient heuristic for global optimization over continuous spaces. Journal of global optimization, 11(4), 341-359.
[30] Damak, N., Jarboui, B., Siarry, P., & Loukil, T. (2009). Differential evolution for solving multi-mode resource-constrained project scheduling problems. Computers & operations research, 36(9), 2653-2659.
[31] Rahimi, A., Karimi, H., & Afshar-Nadjafi, B. (2013). Using meta-heuristics for project scheduling under mode identity constraints. Applied soft computing, 13(4), 2124-2135.
[32] Jarboui, B., Damak, N., Siarry, P., & Rebai, A. (2008). A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied mathematics and computation, 195(1), 299-308.
[33] Akeshteh, Z., & Mardukhi, F. (2017). An imperialist competitive algorithm for resource constrained project scheduling with activities flotation. IJCSNS, 17(5), 125.
[34] Panahi, I., & Nahavandi, N. (2017). An efficient imperialist competitive algorithm for resource constrained project scheduling problem. Journal of industrial engineering, 51(2), 161-174.
[35] Namazi, S., Fard, M. R. Z., Mousavi, S. M. R., & Nasab, M. B. (2014). Solving multi-mode resource constrained project scheduling with IC algorithm and compare it with pso algorithm. Advances in life sciences, 4(3), 140-145.
[36] Wang, X., & Huang, W. (2010). Fuzzy resource-constrained project scheduling problem for software development. Wuhan university journal of natural sciences, 15(1), 25-30.
[37] Maghsoudlou, H., Afshar-Nadjafi, B., & Niaki, S. T. A. (2016). A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem. Computers & chemical engineering, 88, 157-169.
[38] Mendes, J. J. D. M., Gonçalves, J. F., & Resende, M. G. (2009). A random key based genetic algorithm for the resource constrained project scheduling problem. Computers & operations research, 36(1), 92-109.
[39] Ulusoy, G., & Cebelli, S. (2000). An equitable approach to the payment scheduling problem in project management. European journal of operational research, 127(2), 262-278.
[40] Torabi, S. A., & Hassini, E. (2008). An interactive possibilistic programming approach for multiple objective supply chain master planning. Fuzzy sets and systems, 159(2), 193-214.
[41] Rabbani, M., Zhalechian, M., & Farshbaf‐Geranmayeh, A. (2016). A robust possibilistic programming approach to multiperiod hospital evacuation planning problem under uncertainty. International transactions in operational research, 25(1), 157-189.
[42] Xu, J., & Zhou, X. (2013). Approximation based fuzzy multi-objective models with expected objectives and chance constraints: Application to earth-rock work allocation. Information sciences, 238, 75-95.
[43] Dubois, D., & Prade, H. (2012). Possibility theory. Computational complexity (pp. 2240-2252). New York, NY: Springer.
[44] Zahiri, B., Tavakkoli-Moghaddam, R., Mohammadi, M., & Jula, P. (2014). Multi-objective design of an organ transplant network under uncertainty. Transportation research part E: Logistics and transportation review, 72, 101-124.
[45] Mohammadi, M., Torabi, S. A., & Tavakkoli-Moghaddam, R. (2014). Sustainable hub location under mixed uncertainty. Transportation research part E: Logistics and transportation review, 62, 89-115.
[46] Storn, R., & Price, K. (1996, May). Minimizing the real functions of the ICEC'96 contest by differential evolution. Proceedings of IEEE international conference on evolutionary computation (pp. 842-844). IEEE.
[47] Eshraghi, A. (2016). A new approach for solving resource constrained project scheduling problems using differential evolution algorithm. International journal of industrial engineering computations, 7(2), 205-216.
[48] Lucic, P., & Teodorovic, D. (2001). Bee system: modeling combinatorial optimization transportation engineering problems by swarm intelligence. Preprints of the TRISTAN IV triennial symposium on transportation analysis (pp. 441-445). Sao Miguel, Azores Islands, Portugal.
[49] Lucić, P., Teodorovic, D. (2002). Transportation modeling: an artificial life approach. Proceedings of the 14th IEEE international conference on tools with artificial intelligence (216-223). Washington, DC.
[50] Lučić, P., & Teodorović, D. (2003). Computing with bees: Attacking complex transportation engineering problems. International journal on artificial intelligence tools, 12(03), 375-394.
[52] Ardalan, Z., Karimi, S., Poursabzi, O., & Naderi, B. (2015). A novel imperialist competitive algorithm for generalized traveling salesman problems. Applied soft computing, 26, 546-555.
[53] Afruzi, E. N., Najafi, A. A., Roghanian, E., & Mazinani, M. (2014). A multi-objective imperialist competitive algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations. Computers & operations research, 50, 80-96.
[54] Sivanandam, S. N., & Deepa, S. N. (2008). Genetic algorithm optimization problems. Introduction to genetic algorithms (pp. 165-209). Berlin, Heidelberg: Springer.
[55] Mohammadi, M., Tavakkoli-Moghaddam, R., Siadat, A., & Dantan, J. Y. (2016). Design of a reliable logistics network with hub disruption under uncertainty. Applied mathematical modelling, 40(9-10), 5621-5642.
[56] Wu, L., Wang, Y., & Zhou, S. (2010). Improved differential evolution algorithm for resource-constrained project scheduling problem. Journal of systems engineering and electronics, 21(5), 798-805.
[57] Jun, D. H., & El-Rayes, K. (2009). Multi-objective optimization of resource scheduling in construction projects.
Building a sustainable future (pp. 806-815). Seattle, Washington, United States.
[58] Chen, P. H., & Weng, H. (2009). A two-phase GA model for resource-constrained project scheduling. Automation in construction, 18(4), 485-498.
[59] Yang, K. K., Tay, L. C., & Sum, C. C. (1995). A comparison of stochastic scheduling rules for maximizing project net present value. European journal of operational research, 85(2), 327-339.