[1] Ponnambalam, S. G., Aravindan, P., & Naidu, G. M. (2000). A multi-objective genetic algorithm for solving assembly line balancing problem. The international journal of advanced manufacturing technology, 16(5), 341-352.
[2] Kitaw, D., Matebu, A., & Tadesse, S. (2010). Assembly line balancing using simulation technique in a garment manufacturing firm. Zede journal, 27, 69-80.
[3] Nakamura, M., Sakakibara, S., & Schroeder, R. (1998). Adoption of just-in-time manufacturing methods at US-and Japanese-owned plants: some empirical evidence. IEEE transactions on engineering management, 45(3), 230-240.
[4] Jaganathan, V. P. (2014). Line balancing using largest candidate rule algorithm in a garment industry: a case study. International journal of lean thinking, 5(1).
[5] Unuigbe, A. I., Unuigbe, H. A., Aigboje, E. O., & Ehizibue, P. A. (2016). Assembly line balancing using fuzzy logic: a case study of a tricycle assembly line. Open journal of optimization, 5(2), 59-70.
[6] Pearce, B. (2015). A study on general assembly line balancing modeling methods and techniques. (Doctoral Desertion, Clemson University). Retrieved from https://tigerprints.clemson.edu/cgi/viewcontent.cgi?referer=https://scholar.google.com/&httpsredir=1&article=2550&context=all_dissertations
[7] Bahadır, S. K. (2011). Assembly line balancing in garment production by simulation. Assembly line–theory and practice. InTech.
[8] [Hisham, S. F. B. (2013). Assembly line balancing improvement: a case study in an electronic industry (Doctoral dissertation, University Malaysia Pahang). Retrieved from http://umpir.ump.edu.my/id/eprint/7583/1/CD7724.pdf
[9] Van Hop, N. (2006). A heuristic solution for fuzzy mixed-model line balancing problem. European journal of operational research, 168(3), 798-810.
[10] Jaggi, A., Patra, S., & Chaubey, D. S. (2015). Application of line-balancing to minimize the idle time of workstations in the production line with special reference to automobile industry. International journal of, 4(7), 8-12.
[11] Gurjar, D. S. M. K. (2019). A review of balancing assembly line using Pso algorithm. International journal of scientific research & engineering trends, 5(3).
[12] Mazany, P. (1995). A case study: Lessons from the progressive implementation of just-in-time in a small knitwear manufacturer. International journal of operations & production management, 15(9), 271-288. https://doi.org/10.1108/01443579510099788
[13] Erel, E., & Sarin, S. C. (1998). A survey of the assembly line balancing procedures. Production planning & control, 9(5), 414-434.
[14] Kayar, M., & Akyalçin, Ö. C. (2014). Applying different heuristic assembly line balancing methods in the apparel industry and their comparison. Fibres & textiles in Eastern Europe, 6(108), 8-19.
[15] Chen, J. C., Chen, C. C., Su, L. H., Wu, H. B., & Sun, C. J. (2012). Assembly line balancing in garment industry. Expert Systems with Applications, 39(11), 10073-10081.
[16] Ramlan, R., & Tan, G. F. (2012). Cycle time reduction of a garment manufacturing company using simulation technique. Proceedings international conference of technology management, business and entrepreneurship 2012 (ICTEMB2012). Melaka, Malaysia.
http://eprints.uthm.edu.my/id/eprint/3521
[17] Islam, M. M., Mohiuddin, H. M., Mehidi, S. H., & Sakib, N. (2014). An optimal layout design in an apparel industry by appropriate line balancing: A case study. Global journal of research in engineering, 14(5). https://engineeringresearch.org/index.php/GJRE/article/view/1231
[18] Timilsina, B. (2012). Removing bottleneck from a manufacturing unit: A case studies to BETKER OY, Ylivieska-84100, Finland (Doctoral thesis, central Ostrobothnia university of applied sciences, Ylivieska unit). Retrieved from https://www.theseus.fi/bitstream/handle/10024/44630/Timilsina_Binod.pdf?sequ
[19] Boysen, N., Fliedner, M., & Scholl, A. (2007). A classification of assembly line balancing problems. European journal of operational research, 183(2), 674-693.
[20] Wickramasekara, A. N., & Perera, H. S. C. (2016). An improved approach to line balancing for garment manufacturing. Vidyodaya journal of management, 2(1).
[21] Zhu, L., Chen, J., Di, Z., Chen, L., Liu, Y., & Stanley, H. E. (2017). The mechanisms of labor division from the perspective of individual optimization. Physica A: statistical mechanics and its applications, 488, 112-120.
[22] Groover, M. P. (2016). Automation, production systems, and computer-integrated manufacturing. Pearson Education India.
[23] Groover, M., & Zimmers, E. W. J. R. (1983). CAD/CAM: computer-aided design and manufacturing. Pearson Education.
[24] Great, O. E., & Offiong, A. N. I. E. K. A. N. (2013). Productivity improvement in breweries through line balancing Using Heuristic Method. Int. J. Eng. Sci. Technol, 5(3), 475-486.
[25] Salveson, M. (1953). Bank debits and income payments by regions, PAUL B. SIMPsoN, University. Econometrica: journal of the econometric society, 21, 174.
[26] Grzechca, w. (2011, august). Cycle time in Assembly Line Balancing Problem. 2011 21st international conference on systems engineering (pp. 171-174). IEEE.