Forecasting, production planning, and control
Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method

A. Esmaili Dooki; p. Bolhasani; A. Alam Tabriz

Volume 7, Issue 2 , September 2018, , Pages 147-183

https://doi.org/10.22105/riej.2018.127733.1038

Abstract
  Nowadays the Resource Constrained Project Scheduling Problem (RCPSP) has triggered a substantially significant issue among scheduling problems. The purpose of RCPSP is minimizing the duration of the projects due to both limited available resources and precedence constraints. Indeed, it attempts to consume ...  Read More