Fuzzy sets and systems
P. K. Halder; C. L. Karmarker; B. Kundu; T. Daniel
Abstract
Recently, the competitiveness and awareness of productivity have increased rapidly among different industries. Hence, the performance evaluation of the criteria affecting the productivity is needed to improve productivity and strengthen the management of the organization. In Bangladesh, Ready Made Garments ...
Read More
Recently, the competitiveness and awareness of productivity have increased rapidly among different industries. Hence, the performance evaluation of the criteria affecting the productivity is needed to improve productivity and strengthen the management of the organization. In Bangladesh, Ready Made Garments (RMGs) is one of the most probable and profitable sectors which is considered as the main economic strength of the country. In this study, a two-phased research method has been projected to find out some governing factors affecting industry’s output. In the first phase, six criteria associated with the productivity have been identified based on literature, inputs from experts, opinions from the officials and managers of six garments industries in Bangladesh. In the second phase, among different MCDM tools, Fuzzy Analytic Hierarchy Process (FAHP) has been used for evaluating criteria weights and ranking the criteria. Among several criteria, line-balancing criterion has been found as the most important factor to improve the RMG’s productivity.
Engineering Optimization
K. Chitra; P. Halder
Abstract
In today’s competitive environment completing a project within time and budget, is very challenging task for the project managers. This aim of this study is to develop a model that finds a proper trade-off between time and cost to expedite the execution process. Critical path method (CPM) is used ...
Read More
In today’s competitive environment completing a project within time and budget, is very challenging task for the project managers. This aim of this study is to develop a model that finds a proper trade-off between time and cost to expedite the execution process. Critical path method (CPM) is used to determine the longest duration and cost required for completing the project and then the time-cost trade–off problem (TCTP) is formulated as a linear programming model. Here, LINDO program is used to determine the solution of the model. To implement the proposed model, necessary data were collected through interviews and direct discussion with the project managers of Chowdhury Construction Company, Dhaka, Bangladesh. The analysis reveals that through proper scheduling of all activities, the project can be completed within 120 days from estimated duration of 140 days. Reduction of project duration by 17% is achieved by increasing cost by 3.73%, which is satisfactory.