Number of Articles: 132
-24. A New Method for Ranking Efficient DMUs Based on TOPSIS and Virtual DMUs

Volume 1, Issue 1, Spring 2012, Pages 1-9

F. Hosseinzadeh Lotfi; M. Rostamy mal khalifeh; M. Heydari Alvar


-23. Customer Involvement in Innovation Process Based on Open Innovation Concepts

Volume 1, Issue 2, Summer 2012, Pages 1-9

P. Moghaddam; M.J. Tarokh


-22. A Novel Discrete Electromagnetism-Like for Fuzzy Open Shop Scheduling Problem with Parallel Machines to Minimize Makespan

Volume 1, Issue 3, Autumn 2012, Pages 1-25

A. Jafari; P. Chiniforooshan; F. Mousavinejad; Sh. Shahparvari


-21. The Impact of Total Quality Management on Organizational Innovation

Volume 2, Issue 1, Winter 2013, Pages 1-11

H. Zandhessami; A. Jalili


-20. Collaborative Information System for Managing the Supply Chain: Architecture Based on a Multi Agent System

Volume 2, Issue 2, Spring 2013, Pages 1-16

W. Dachry; B. Aghezzaf; B. Bensassi


-19. Fuzzy Big-M Method for Solving Fuzzy Linear Programs with Trapezoidal Fuzzy Numbers

Volume 2, Issue 3, Summer 2013, Pages 1-9

A. Hatami; H. Kazemipoor


-17. An Interdiction Median Model for Hierarchical Capacitated Facilities

Volume 3, Issue 1, Spring 2014, Pages 1-10

A. Forghani; F. Dehghanian


-16. A Robust Stochastic Programming Approach for Blood Collection and Distribution Network Design

Volume 3, Issue 2, Spring 2014, Pages 1-11

B. Zahiri; M. Mousazadeh; A. Bozorgi-Amiri


-14. Organizational Performance Evaluation Considering Human Capital Management Approach by Fuzzy-DEA: A Case Study

Volume 6, Issue 1, Winter 2017, Pages 1-16

M. M. Tavakoli; B. Molavi; H. Shirouyehzad


-13. Fuzzy Goal Programming for Linear Facility Location-Allocation in a Supply Chain; The Case of Steel Industry

Volume 6, Issue 2, Spring 2017, Pages 90-105

S. M. Arabzad; M. Ghorbani; M. J. Ranjbar


-10. A Taghuchi based Multi Objective Time-Cost Constrained Scheduling for Resource Availability Cost Problem: A Case Study

Volume 6, Issue 4, Autumn 2017, Pages 269-282

M. Rabbani; S. Aghamohamadi; H. Farrokhi-Asl; M. Alavi mofrad


-8. Fixed point theorems of LW-type Lipschitz cyclic mappings in complete B-metric-like spaces

Volume 7, Issue 2, Summer 2018, Pages 136-146

Sh. Weng; Y. Zhang; D. P. Wu


-7. Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

Volume 7, Issue 3, Autumn 2018, Pages 254-306

F. Ghassemi Tari; M. Rezapour Niari


-6. Development of a doctor scheduling system: a constraint satisfaction and penalty minimisation scheduling model

Volume 7, Issue 4, Autumn 2018, Pages 396-422

T. Chawasemerwa; I. W. Taifa; D. Hartmann


-4. Multi-objective linear mathematical programming for solving U-shaped robotic assembly line balancing

Volume 8, Issue 1, Spring 2019, Pages 1-16

M. Rabbani; A. H. Khezri; H. Farrokhi-Asl; S. Aghamohamadi-Bosjin


-3. A Framework to Evaluate and Improve Supply Chain: FAHP Based Case Study on a Supermarket

Articles in Press, Accepted Manuscript, Available Online from 07 October 2019

Shuvo Haldar; Karmaker chitra; Rojen Hossain


-2. Duplicate Genetic Algorithm for Scheduling a Bi-Objective Flexible Job Shop Problem

Volume 1, Issue 2, Summer 2012, Pages 10-26

H. Mohammadi-Andargoli; R. Tavakkoli-Moghaddam; N. Shahsavari Pour; M.H. Abolhasani-Ashkezari


0. Optimization of Emergency Management System in a Construction Organization in India

Volume 1, Issue 3, Autumn 2012, Pages 26-38

S.V.S. Raja Prasad; Y.V.S.S.S.V. Prasad Rao