[1] Pour, N. S., Modarres, M., & Moghadam, R. T. (2012). Time-cost-quality trade-off in project scheduling with linguistic variables. World applied sciences journal, 18(3), 404-413.
[2] Kelley Jr, J. E. (1961). Critical-path planning and scheduling: Mathematical basis. Operations research, 9(3), 296-320.
[3] Mobini, M., Mobini, Z., & Rabbani, M. (2011). An Artificial Immune Algorithm for the project scheduling problem under resource constraints. Applied soft computing, 11(2), 1975-1982.
[4] Phillips Jr, S., & Dessouky, M. I. (1977). Solving the project time/cost tradeoff problem using the minimal cut concept. Management science, 24(4), 393-400.
[5] Shouman, М. Л., Abu El-Nour, A., & Elmehalawi, E. (1991). SCHEDULING NATURAL GAS PROJECTS IN CAIRO USING CPM AND TIME/COST TRADE-OFT. Alexandria engineering journal, 30(2), 157-166.
[6] Agarwal, A., Colak, S., & Erenguc, S. (2011). A neurogenetic approach for the resource-constrained project scheduling problem. Computers & operations research, 38(1), 44-50.
[7] Liu, L., Burns, S. A., & Feng, C. W. (1995). Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of construction engineering and management, 121(4), 446-454.
[8] Hindelang, T. J., & Muth, J. F. (1979). A dynamic programming algorithm for decision CPM networks. Operations research, 27(2), 225-241.
[9] De, P., Dunne, E. J., Ghosh, J. B., & Wells, C. E. (1995). The discrete time-cost tradeoff problem revisited. European journal of operational research, 81(2), 225-238.
[10] Arauzo, J. A., Galán, J. M., Pajares, J., & López-Paredes, A. (2009). Multi-agent technology for scheduling and control projects in multi-project environments. An Auction based approach. Inteligencia artificial. Revista iberoamericana de inteligencia artificial, 13(42).
[11] Abbasimehr, H., & Alizadeh, S. (2013). A novel genetic algorithm based method for building accurate and comprehensible churn prediction models. International journal of research in industrial engineering, 2(4), 1.
[12] Feng, C. W., Liu, L., & Burns, S. A. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. Journal of computing in civil engineering, 11(3), 184-189.
[13] Li, H., Cao, J. N., & Love, P. E. D. (1999). Using machine learning and GA to solve time-cost trade-off problems. Journal of construction engineering and management, 125(5), 347-353.
[14] Ponnambalam, S. G., Aravindan, P., & Rao, M. S. (2003). Genetic algorithms for sequencing problems in mixed model assembly lines. Computers & industrial engineering, 45(4), 669-690.
[15] Shahsavari-Pour, N., Modarres, M., Tavakoli-Moghadam, R., & Najafi, E. (2010). Optimizing a multi-objectives time-cost-quality trade-off problem by a new hybrid genetic algorithm. World applied science journal, 10(3), 355-363.
[16] Azaron, A., Perkgoz, C., & Sakawa, M. (2005). A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied mathematics and computation, 168(2), 1317-1339.
[17] Azaron, A., Perkgoz, C., & Sakawa, M. (2005). A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied mathematics and computation, 168(2), 1317-1339.
[18] El Razek, R. H. A., Diab, A. M., Hafez, S. M., & Aziz, R. F. (2010). Time-cost-quality trade-off software by using simplified genetic algorithm for typical repetitive construction projects. World academy of science, engineering and technology, 61, 312-321.
[19] Chua, D. K. H., Chan, W. T., & Govindan, K. (1997). A time-cost trade-off model with resource consideration using genetic algorithm. Civil engineering systems, 14(4), 291-311.
[20] Pathak, B. K., & Srivastava, S. (2007, September). MOGA-based time-cost tradeoffs: responsiveness for project uncertainties. Proceedings of congress on evolutionary computation, CEC. 3085-3092. IEEE.
[21] Pathak, B. K., Srivastava, S., & Srivastava, K. (2008). Pathak, B. K., Srivastava, S., & Srivastava, K. (2008). Neural network embedded multiobjective genetic algorithm to solve non-linear time-cost tradeoff problems of project scheduling.
Journal of scientific and industrial research (JSIR), 67(2).
[22] Chen, W. N., Zhang, J., Chung, H. S. H., Huang, R. Z., & Liu, O. (2010). Optimizing discounted cash flows in project scheduling—An ant colony optimization approach. IEEE transactions on systems, man, and cybernetics, part C (applications and reviews), 40(1), 64-77.
[23] Zeinalzadeh, A. (2011). An application of mathematical model to time-cost tradeoff problem (case study). Australian journal of basic and applied sciences, 5(7), 208-214.
[24] Biswas, S. K., Karmaker, C. L., & Biswas, T. K. Time-Cost Trade-Off Analysis in a Construction Project Problem: Case Study.
[25] Mokhtari, H., Aghaie, A., Rahimi, J., & Mozdgir, A. (2010). Project time–cost trade-off scheduling: a hybrid optimization approach. The international journal of advanced manufacturing technology, 50(5-8), 811-822.
[26] Błaszczyk, T., & Nowak, M. (2009). The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure. Technological and economic development of economy, 15(4), 523-539.
[27] Hosseini-Nasab, H., Pourkheradmand, M., & Shahsavaripour, N. (2017). Solving multi-mode time-cost-quality trade-off problem in uncertainty condition using a novel genetic algorithm. International journal of management and fuzzy systems, 3(3), 32.
[28] Su, Z., Qi, J., & Wei, H. (2017). Simplifying the nonlinear continuous time-cost tradeoff problem. Journal of systems science and complexity, 30(4), 901-920.
[29] Zou, X., Fang, S. C., Huang, Y. S., & Zhang, L. H. (2016). Mixed-Integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration. Journal of computing in civil engineering, 31(3), 06016003.